| Our first day at the work site. |
| Denis is our instructor today on the proper and safe use of the jumbo scissor lift. |
| The construction site of the inside of the bus depot. |
| The wall the mosaic is going on. We won't be installing today as the crates are set to arrive tomorrow. |
| The view of our wall across the river in the Bronx. |
| With the crates arrival, we can begin to install today. |
| We load everything onto the scissor lift, including our cooler...full of water. |
| We dry fit the first piece... |
| And then we install it. |
| We check to make sure the piece is level. |
| And then we continue with the next 4 pieces. |
| We finish before lunch just before it's about to rain. |
| Luckily it clears up after lunch so we can continue to work. |
| It conveniently waited to rain again till we were done for the day but we clearly have a long way to go till the end. End of day 1! |