Our first day at the work site. |
Denis is our instructor today on the proper and safe use of the jumbo scissor lift. |
The construction site of the inside of the bus depot. |
The wall the mosaic is going on. We won't be installing today as the crates are set to arrive tomorrow. |
The view of our wall across the river in the Bronx. |
With the crates arrival, we can begin to install today. |
We load everything onto the scissor lift, including our cooler...full of water. |
We dry fit the first piece... |
And then we install it. |
We check to make sure the piece is level. |
And then we continue with the next 4 pieces. |
We finish before lunch just before it's about to rain. |
Luckily it clears up after lunch so we can continue to work. |
It conveniently waited to rain again till we were done for the day but we clearly have a long way to go till the end. End of day 1! |